fischer fixing systems

03/09/2026

fischer impresses at DACH+HOLZ International

From 24 to 27 February 2026, DACH+HOLZ once again served as a central meeting place for the roofing and timber construction industry. Numerous visitors came to the fischer booth 304 in Hall 9. Covering an area of around 160 m², the fixing expert impressed with innova-tions, practical applications and interactive elements. The broad spectrum ranged from product premieres to proven classics – always with the clear invitation to experience them directly on site. Interactive craftsman and profes-sional challenges, promotions and live demonstrations provided additional action at the booth.

More information
03/04/2026

Getting the most out of wood

Wood is in demand worldwide – whether in prefabricated housing or multi-storey residential construction. Hardly any other building material combines climate neutrality, outstanding building-physics properties, a healthy indoor climate and natural aesthetics as convincingly as this renewable resource. At the same time, wood enables a high degree of prefabrication and fast installation. Versatile and high-performance fischer structural timber screws make it possible to get the most out of wood – with outstanding safety, efficiency and application versatility.

More information
02/19/2026

Solar power from balcony

The mini PV system has been delivered, the box opened, and anticipation is high. But then comes the crucial question: "How do I attach the balcony power plant securely so that it stays firmly in place even during the next autumn storm?" The good news is that, with a few simple tricks, installation is easier than expected. By following a few basic rules, the balcony power plant can be installed quickly, safely, and permanently – providing clean electricity right outside the balcony door.

More information
02/18/2026

fischer overcomes challenges posed by the Venetian Lagoon

fischer’s UltraCut FBS II stainless steel concrete screws and FIS EM Plus injection mortar ensure stable connec-tions and efficient installation at the ACTV landing stage ‘San Zaccaria Danieli’ in the Italian city of Venice.

More information
02/10/2026

Solid anchoring on Earth for new views into space

With a primary mirror diameter of 39 m, the world’s largest optical and near‑infrared telescope is being built on Cerro Armazones in Chile – the Extremely Large Telescope (ELT). This groundbreaking project of the European Southern Observatory (ESO) will allow unprecedented insights into the depths of the Universe. Fastening and system solutions, together with accompanying engineer-ing and BIM services from fischer, ensure the safe and efficient installation of the piping systems of the building services (MEP).

More information
More results
Seen 20 of 322 result (s)
cd-blue-68969894d7-clvxv